Rail clip installation rail clip installation Prerequisites for the rail clip installation 1. The rail presser is installed after the steel beam on the crane rails surface is adjusted; 2. The steel beam of the crane must be 3. The rail pressure device should be installed; 4. Before the installation of the rail clamp , the surface paint of the crane beam is finished and meets the requirements of the current regulations; 5. Before the installation of the rail presser, the track joints should be connected, and the track joints and side bending deviations should meet the requirements of “Steel Structure Engineering and Acceptance Specifications”-83). 6. The welding of the base plate control plate and the steel suspension beam should meet the design requirements. Installation sequence and essentials A. Welding the fixed base, the fixed base can be used, the three grooves on the surface and the position of the rail presser can be positioned, and the allowable deviation of the position ...