Skip to main content

WJKC Rail Clips Supplier from China

 

WJKC Rail Clips Supplier from China

Gloryrail is a WJKC rail clips supplier from China, we could offer two types of rail clips, namely bolted clips and welded rail clips.
WJKC rail clips are welded rail clips, also known as track clamp, is a fastener used to fix rails during rail laying. It is also a welded rail fixture and is a widely used crane beam rail fixing standard.

WJCK rail clips supplier

WJCK rail clips supplier

Instructions for use of the WJK welded rail press: steel plates need to be pre-embedded for foundation construction, the 3 sides of the base are welded to the pre-embedded steel plates, the upper cover is against the edge of the rail, the bolts and the shaft are adjusted to control the pressure and tightness. Install one set on each side of the rail, and the rail needs to be fixed with a pair of rail clamps every 600mm or 500mm

Comments

Popular posts from this blog

30 LB RAIL FOR SALE

  30 LB RAIL FOR SALE What is a 30 lb rail? A 30 lb rail refers to a rail weighing 30 lb in meters, which is an ASCE 30 model rail produced according to ASTM A1. As a common light track, it is mainly used for laying mining track lines. Therefore, it is widely used in the South American market. The dimensions of the 30 lb rail are as follows: Head width: 42.9mm Track height: 79.4mm Track bottom width: 79.4mm Waist thickness: 8.4mm GloryRail is an important  mining rail  supplier in China. Engaged in rail supply for more than 20 years. Rail products are exported to many countries and regions around the world. Trusted and supported by many mining customers. We maintain long-term cooperative relationships with many important customers in Peru, Colombia, Panama, and Venezuela in South America BUY 30 LB RAIL FROM CHINA As the world’s most important rail tracks production base. There are six major steel mills in China producing rails with an annual output of millions of tons. G...

Welding Process of Overhead Crane Rail Joint

Welding Process of Overhead Crane Rail Joint In order to make the overhead crane rail transport more stable, rail splints will not be used for the overhead crane rail joint connection, but welded joint connection will be used. The main key to the welded joint is to solve the bending deformation and weld cracking of the overhead crane rail joint. During the welding process of the overhead crane rail joint, the overhead crane rail joint is deformed downwardly, so the overhead crane rail end must be padded to a certain height before welding to ensure that the rail joint can be kept straight after the welding is completed. The height of the rail end pad is determined by factors such as the type of rail, length, fixing method and ambient temperature. The rails are fixed to the crane beam by means of hook bolts, and each joint is provided with four fixed points. After the bottom of the rail is welded, reduce the height to 20mm, and then tighten the hook bolts to continue welding. When the o...

Rail clip installation

Rail clip installation rail clip installation Prerequisites for the rail clip installation 1. The rail presser is installed after the steel beam on the crane rails surface is adjusted; 2. The steel beam of the crane must be 3. The rail pressure device should be installed; 4. Before the installation of the  rail clamp , the surface paint of the crane beam is finished and meets the requirements of the current regulations; 5. Before the installation of the rail presser, the track joints should be connected, and the track joints and side bending deviations should meet the requirements of “Steel Structure Engineering and Acceptance Specifications”-83). 6. The welding of the base plate control plate and the steel suspension beam should meet the design requirements. Installation sequence and essentials A. Welding the fixed base, the fixed base can be used, the three grooves on the surface and the position of the rail presser can be positioned, and the allowable deviation of the position ...