Skip to main content

Welding Process of 40×60 Crane Rail Flat Bar


Welding Process of 40×60 Crane Rail Flat Bar
Regarding the pre-weld treatment, the iron oxide, floating rust and various impurities of the end face of the 40×60 crane rail flat bar should be thoroughly polished with a sander before the hoisting is in place. A heat-insulating tile should be placed between the 40×60 crane rail flat bar and the rubber pad to protect the pad from heat loss. A gap of 15mm to 20 mm is reserved for the adjacent two rails as a welding spacer. Since the base material has high carbon content, large rigidity, and large thickness, an alkaline low-hydrogen welding rod with high resistance to cold cracking, high thermal cracking resistance and the same strength level must be selected. Before use, the electrode will be placed in a 350°C to 400°C insulation tube. During welding process, we should select welding rods with diameters of 4mm and 5mm with a welding machine, and reverse the DC to reduce the splash of metal and the pores in the weld. Pre-welding preheating is the main measures for welding medium carbon steel. Due to the large tendency of the base material to harden, it is necessary to preheat to slow down the cooling rate, improve the microstructure of the joint, reduce the hardness and brittleness of the heat affected zone, and improve the plasticity to prevent the occurrence of cold cracks.
Before welding, preheat the range of 10cm to 15 cm on both sides of the 40×60 crane rail flat bar weld with oxyacetylene flame to 200°C – 250 °C. According to the cross-sectional shape of the rail and several sets of welding modules prepared before welding, the module comprises 1 bottom mold and 2 side molds, the material is electrolyte brass, the bottom mold is 8 mm thick, and the side mold is 10 mm thick. After the 40×60 crane rail flat bar is placed on the bottom mold, a steel gasket with the same width as the partition and the same length as the bottom of the rail and thickness of 3 mm is placed on the bottom mold at the bottom of the partition. The 40×60 crane rail flat bar is welded immediately after preheating, and the welding is continuously performed and can not be interrupted. First, we should use small current to melt the metal along the side of the steel gasket to ensure that the rail and steel gasket are completely fused together. After the first layer is welded, the slag should be removed immediately and the second layer is welded. The welding of the first layer can be carried out with small current, and the welding rod runs straightly. Starting from the second layer, the welding current is increased, and the welding rod is continuously moved forward while swinging in the lateral direction, and is sequentially performed until the bottom of the 40×60 steel flat bar is welded. After each layer is welded, the welding slag and the splash metal are removed and the next layer is welded. Each layer of the weld is kept to a thickness of 3mm to 4mm. After the bottom of the 40×60 crane rail flat bar is welded, the slag is cleaned, the side mold matching the curvature of the rail is installed in place, and a gap of 3mm-5 mm is reserved between the side mold and the rail for the slag to flow out. During welding process, we should adjust the current appropriately, and the electrode moves slowly forward while doing lateral movement to complete the welding of each layer. For each layer of welding, the welding slag must be cleaned until the deposited metal at the welding site is slightly higher than the top of the rail by 1mm-2 mm.

Comments

Popular posts from this blog

What are railway rail fasteners?

What are railway rail fasteners? Railway rail fasteners Railway rail fasteners are a kind of railway accessories. The parts used to combine rails and sleepers (or other types of under-rail foundations) on the track are also called central joint parts. Its function is to fix the steel rail on the sleeper, maintain the gauge and prevent the longitudinal and lateral movement of the rail relative to the sleeper. The railway rail fastener system is divided into the shrapnel fastener system, gusset fastener system, and elastic strip fastener system. The gusset-type fastener is composed of a gusset plate, a threaded spike, a spring washer, an iron seat, and a buffer pad. The threaded spike is anchored in the reserved hole of the concrete sleeper bearing platform with sulfur cement mortar, and then bolts are used to fasten the buckle. Plate fastened. There are elastic strips I, II, and III types of clip fasteners. Type I elastic strip is composed of ω elastic strip,  screw spike , gauge b...

30 LB RAIL FOR SALE

  30 LB RAIL FOR SALE What is a 30 lb rail? A 30 lb rail refers to a rail weighing 30 lb in meters, which is an ASCE 30 model rail produced according to ASTM A1. As a common light track, it is mainly used for laying mining track lines. Therefore, it is widely used in the South American market. The dimensions of the 30 lb rail are as follows: Head width: 42.9mm Track height: 79.4mm Track bottom width: 79.4mm Waist thickness: 8.4mm GloryRail is an important  mining rail  supplier in China. Engaged in rail supply for more than 20 years. Rail products are exported to many countries and regions around the world. Trusted and supported by many mining customers. We maintain long-term cooperative relationships with many important customers in Peru, Colombia, Panama, and Venezuela in South America BUY 30 LB RAIL FROM CHINA As the world’s most important rail tracks production base. There are six major steel mills in China producing rails with an annual output of millions of tons. G...
  What are seamless rails? seamless rails Continuous seamless rails, also known as a welded long rail line, is a line that welds ordinary rails without leaving rail seams. meters or longer. The long rails are laid and fixed on the sleepers within the specified temperature range. There are rail slits at the end of the long rail, and the middle part cannot expand or contract with the temperature rise and fall. Therefore, the middle section of the steel rail will generate a large temperature pressure in summer and a large temperature tension in winter. The large pressure and tensile force in the rail can be calculated according to the annual high and low temperature of the place where the rail is laid. The large pressure on the rail should not cause the rail to buckle, and the large tensile force should not cause the rail to break. The seamless rails line greatly reduces the  rail joints , reduces the impact on the rails when the wheels pass through the joints, is conducive to s...