The quality of the 30×50 crane rail installation directly affects the quality of the crane’s operation. Only by grasping the quality control from the source can the installation quality of the 30×50 crane rail square steel bar be guaranteed. Through the understanding of the 30×50 crane rail installation technology, the inspectors can master the key parts and technical points of the inspection process, and ensure the quality of supervision and inspection.
Span measurement
1.Tension measurement can be carried out with steel tape spring dynamometer.
2.The span should be measured at each column, and the selected points should be corrected by the diagonal method to improve the accuracy of the measurement.
3.The same tension should be used during the measurement and the measurement reading should be corrected.
4.The final measurement reading after the adjustment is completed shall be the official record of the acceptance of the work.
As for orbital straight line measurements, straightness measurements can be made with a theodolite, or can be measured with a steel rule through wire-drawing method, with a minimum of one measurement per span.
Regarding the elevation and level measurement, it is usually measured with a water level gauge. If the elevation line is already drawn on the side of the crane beam, it can be measured with a level gauge and a steel ruler. This method can also be used when the elevation line is marked on the column. When the level is measured for height and level, a scale with a minimum scale of 1 mm is applied and placed straight in the center of the top surface of the 30×50 crane rail. Regarding the 30×50 crane rail joints with the gap and joint offset, the joint gap is measured with a thickness gauge and can also be measured directly with a steel ruler. The deviation of the general joint and expansion joint should be within the allowable range. The joint offset is measured on the measuring surface with a level ruler or a straight ruler, and the offset is measured within the allowable range. The joints of the corresponding rails shall be staggered not less than 600 mm and shall not be equal to the large wheelbase. The joint plate bolts should be used with the joint plate. The welded joints should be smooth and smooth, and there must be no raised welds.
For newly laid 30×50 crane rail, the results of the final inspection shall be recorded in detail and accurately in the installation self-test records as the basis for review and correction. After a certain period of use, it is necessary to check whether it sinks, whether the joint is loose, and whether the track has displacement. If problems are found, it should be sorted out in time. The installation quality of the crane track is the basis of the performance of the crane. It directly affects the operation quality of the crane. Only the inspectors have mastered the key parts and technical points in the inspection process, and the quality is guaranteed from the source to ensure the quality of supervision and inspection of the crane installation.

Comments

Popular posts from this blog

Principle of rail clamp design

Principle of rail clamp design rail clamp design The rail clamp design has several functional features: 1. Adjustability: The adjustable length is 15mm, and its adjustability functions include: (1) The rail presser is easy to install, saves time, and has high precision (2) The track can be adjusted if the structure of the support beam is slightly changed. 2. Anti-loosening: Under the action of the lateral force of the track, through the force analysis of the welding RTYB, a part of these lateral forces are transmitted to the bottom seat through the upper cover plate as the pressure of the bottom edge to seat on the upper cover plate. The other part is the lateral friction between the base and the upper cover. Since the wedge-shaped action between the base and the upper cover plate is converted into the tightening force of the bolts, it has an anti-loosening effect. 3. Self-locking: The three pieces are self-locking together through the interaction of the upper cover, the base, and the

steel chamfer / triangular steel bar supplier from China- Glroysteelwork

steel chamfer / triangular steel bar supplier from China- Glroysteelwork Steel chamfer is manufactured from cold drawn steel and can be welded or bolted into place to provide relief from sharp edges to reduce chipping and spalling.Steel chamfer is available in three sizes: 10mm*10mm15mm*15mm20mm*20mm25mm*25mm Glorysteelwork is an professional manufacture of cold drawn, we have many years export experiences and long term cooperation clients. Materials: SS400/A36/Q235B Length:4000mm or as required Contact Us E-mail: info@glorysteelwork.com Whatsapp:86 15036167067 Mobile: 86 15036167067 Skype: karenwu7067

What is rail creep

What is rail creep rail creep Rail creep is also known as line crawl. The creeping phenomenon of the rail along the longitudinal direction of the line. With the increase in railway transportation tasks, the impact of the wheels on the rails when the train is running accelerates the creep of the rails. Rail creep can cause many diseases of the line. In order to prevent the occurrence of track creep diseases, it is necessary to find out the real cause of creeping in order to effectively eliminate the problem. There are two different manifestations: the rails move along the soft sleeper surface due to insufficient fastening pressure of the fasteners; the longitudinal movement of the row is caused by insufficient ballast bed resistance. The reason for this is the longitudinal force of the rail caused by the wheel rolling and longitudinal slip, train braking, the change of rail temperature, and the creep caused by the deflection and deformation of the rail under the action of the wheel load