Heat Treatment of 50×50 Crane Rail Square Steel After Welding


Heat Treatment of 50×50 Crane Rail Square Steel After Welding
After the 50×50 crane rail square steel is welded and the module is removed, the welded joint should be heat treated in time to slow down the cooling rate, improve the structure and performance of the joint, and simultaneously make hydrogen easily diffuse and discharge to reduce the occurrence of cold cracks. Considering the conditions at the construction site, the 50×50 steel square bar joints are treated with medium temperature tempering with oxyacetylene flame. The torch flame is adjusted to a neutral flame, and the welding zone is heated simultaneously on both sides of the 50×50 crane rail square steel by two welding torches, from top to bottom, and repeated until the temperature of the welded joint reaches about 350°C. A torch can be used for insulation. Reduce the jet velocity of the mixed gas and the temperature of the flame, and use the welding torch to continuously heat the weld on both sides of the 50×50 crane rail square steel for about 30 minutes. After heating, cover the weld around with the high temperature material such as asbestos, and let it cool naturally to the ambient temperature. After the joint temperature drops to room temperature, the top and sides of the 50×50 crane rail square steel are polished.
The slag inclusion is due to the fact that the weld slag is not completely discharged or cleaned during welding and remains inside the weld. During the welding operation, the arc blow force and the gap between the side mold and the 50×50 crane rail square steel can be appropriately increased, and the welding slag of the previous layer is cleaned and then welded to the next layer. The crack generated near the fusion line is a cold crack, which is due to the hardening tendency of the base material, the restraining stress, and the action of hydrogen. The effective process to reduce cold cracking is to further improve the pre-weld preheating temperature (above 300°C) and the post-weld tempering temperature (above 400°C). Preheating is necessary after installation of the side mold and before welding the waist. Local unfused is mainly because the high temperature residence time of the arc at the fusion line is too short, and the arc is not in place. This requires the welding operator to control the heat input during the welding, so that the weld metal and the base material can achieve mutual fusion on atomic level.
Practice has proved that although the welding performance of the QU crane rail is poor, as long as a reasonable welding process is adopted, the internal structure and mechanical properties of the rail welded joint can fully meet the design and specification requirements.

Comments

Popular posts from this blog

30 LB RAIL FOR SALE

  30 LB RAIL FOR SALE What is a 30 lb rail? A 30 lb rail refers to a rail weighing 30 lb in meters, which is an ASCE 30 model rail produced according to ASTM A1. As a common light track, it is mainly used for laying mining track lines. Therefore, it is widely used in the South American market. The dimensions of the 30 lb rail are as follows: Head width: 42.9mm Track height: 79.4mm Track bottom width: 79.4mm Waist thickness: 8.4mm GloryRail is an important  mining rail  supplier in China. Engaged in rail supply for more than 20 years. Rail products are exported to many countries and regions around the world. Trusted and supported by many mining customers. We maintain long-term cooperative relationships with many important customers in Peru, Colombia, Panama, and Venezuela in South America BUY 30 LB RAIL FROM CHINA As the world’s most important rail tracks production base. There are six major steel mills in China producing rails with an annual output of millions of tons. G...

Study on Cooling Method of SUP9 Spring Flat Steel

Study on Cooling Method of SUP9 Spring Flat Steel Hot rolled spring flat steel bar is mainly used for the automotive industry, and it’s the raw material for automobile leaf spring  manufacturing. The main varieties of spring steel include 60Si2Mn spring steel,  SUP9 spring steel flat bar , 55SiMnVB spring steel. SUP9 spring steel flat bar is produced in accordance with the Japanese standard. At present, many leaf spring manufacturers mostly use SUP9 spring steel as the raw material for manufacturing automotive leaf springs. Compared with 60Si2Mn, SUP9 spring steel has good hardenability and low decarburization tendency, so the mechanical properties and fatigue properties of the leaf springs produced with SUP9 spring steel are better than that of 60Si2Mn steel. However, due to the good hardenability of  SUP9 steel , the hardness is often too high during actual rolling production and cooling. The reheating, quenching and tempering treatment are carried out in...

Rail clip installation

Rail clip installation rail clip installation Prerequisites for the rail clip installation 1. The rail presser is installed after the steel beam on the crane rails surface is adjusted; 2. The steel beam of the crane must be 3. The rail pressure device should be installed; 4. Before the installation of the  rail clamp , the surface paint of the crane beam is finished and meets the requirements of the current regulations; 5. Before the installation of the rail presser, the track joints should be connected, and the track joints and side bending deviations should meet the requirements of “Steel Structure Engineering and Acceptance Specifications”-83). 6. The welding of the base plate control plate and the steel suspension beam should meet the design requirements. Installation sequence and essentials A. Welding the fixed base, the fixed base can be used, the three grooves on the surface and the position of the rail presser can be positioned, and the allowable deviation of the position ...