Skip to main content

Current Status and Analysis of Steel Rails after Heat Treatment


Current Status and Analysis of Steel Rails after Heat Treatment


With the continuous development of high-speed and heavy-duty railways, the construction of seamless lines has become an important part of railway development, and the welding joints of the steel rail flat bar are related to the key aspects of seamless line quality. Therefore, at present, domestic and foreign railway construction units and related management departments have strictly controlled the quality of the rail welding process, and have also adopted corresponding post-weld treatment measures to ensure the quality of the on-line steel rail flat bar welded joints. Among them, an important means for improving the internal structure of the welded joint during post-weld heat treatment can eliminate the superheating zone near the fusion line, refine the grain, improve the weld strength and toughness. In the construction of railways in China, post-weld heat treatment of steel rail flat bar is an indispensable part. Flash welding and gas welding heads must be heat treated after welding, including normalizing and any process measures to increase or decrease the cooling rate of the welded joint. Generally, the fixed flash joints in the welding steel rail flat bar factory are mostly heated by medium frequency electric induction, and then subjected to normalizing treatment by means of forced air cooling. The on-site moving flash welding head and the air pressure welding head are limited by the construction environment and equipment conditions, and are often heated by a gas pressure welding heater flame swing method, and then normalized in a natural cooling manner during the construction period. With the advancement of technology, mobile medium frequency electric induction and heating equipment for on-site flash welding and air-welding head heat treatment have also been successfully developed, and satisfactory test results have been obtained.


The electric induction heating equipment used for post-weld heat treatment of steel rail flat bar is mostly medium frequency inverter induction heating equipment, including power supply, intermediate frequency power supply, water cooling system, compensation capacitor, intermediate frequency transformer, heater, air spray (spray) cooling device and data acquisition and Management system and other parts. The production process of steel rail flat bar heat treatment after welding with medium frequency electric induction heating method should be controlled from heating start temperature, maximum heating temperature, heating time, heating power, frequency, DC voltage, DC current, air injection starting temperature, air blowing end temperature, wind pressure, joint heat uniformity, and other parameters by. The steel rail flat bar material is mostly high carbon steel in the hypoeutectoid steel, and the normalizing heat treatment temperature is usually from 820 °C to 840 °C, and after a period of heat preservation, it is cooled to room temperature in air or forced flow of air. However, there is no heating and post-heating device for the base and on-site rail welding. Only the method of instantaneous overheating can promote the full transformation of the internal structure of the rail joint. Therefore, the maximum heating temperature of the rail head is required to be controlled between 850 °C and 950 °C. In addition, since the normalizing temperature is too high, the grain will continue to grow and the quality requirements of the relevant standards cannot be met. Therefore, the normalizing temperature should be lower than 500 °C.

Comments

Popular posts from this blog

30 LB RAIL FOR SALE

  30 LB RAIL FOR SALE What is a 30 lb rail? A 30 lb rail refers to a rail weighing 30 lb in meters, which is an ASCE 30 model rail produced according to ASTM A1. As a common light track, it is mainly used for laying mining track lines. Therefore, it is widely used in the South American market. The dimensions of the 30 lb rail are as follows: Head width: 42.9mm Track height: 79.4mm Track bottom width: 79.4mm Waist thickness: 8.4mm GloryRail is an important  mining rail  supplier in China. Engaged in rail supply for more than 20 years. Rail products are exported to many countries and regions around the world. Trusted and supported by many mining customers. We maintain long-term cooperative relationships with many important customers in Peru, Colombia, Panama, and Venezuela in South America BUY 30 LB RAIL FROM CHINA As the world’s most important rail tracks production base. There are six major steel mills in China producing rails with an annual output of millions of tons. G...

Study on Cooling Method of SUP9 Spring Flat Steel

Study on Cooling Method of SUP9 Spring Flat Steel Hot rolled spring flat steel bar is mainly used for the automotive industry, and it’s the raw material for automobile leaf spring  manufacturing. The main varieties of spring steel include 60Si2Mn spring steel,  SUP9 spring steel flat bar , 55SiMnVB spring steel. SUP9 spring steel flat bar is produced in accordance with the Japanese standard. At present, many leaf spring manufacturers mostly use SUP9 spring steel as the raw material for manufacturing automotive leaf springs. Compared with 60Si2Mn, SUP9 spring steel has good hardenability and low decarburization tendency, so the mechanical properties and fatigue properties of the leaf springs produced with SUP9 spring steel are better than that of 60Si2Mn steel. However, due to the good hardenability of  SUP9 steel , the hardness is often too high during actual rolling production and cooling. The reheating, quenching and tempering treatment are carried out in...

Rail clip installation

Rail clip installation rail clip installation Prerequisites for the rail clip installation 1. The rail presser is installed after the steel beam on the crane rails surface is adjusted; 2. The steel beam of the crane must be 3. The rail pressure device should be installed; 4. Before the installation of the  rail clamp , the surface paint of the crane beam is finished and meets the requirements of the current regulations; 5. Before the installation of the rail presser, the track joints should be connected, and the track joints and side bending deviations should meet the requirements of “Steel Structure Engineering and Acceptance Specifications”-83). 6. The welding of the base plate control plate and the steel suspension beam should meet the design requirements. Installation sequence and essentials A. Welding the fixed base, the fixed base can be used, the three grooves on the surface and the position of the rail presser can be positioned, and the allowable deviation of the position ...