Skip to main content

Application of S45C Steel Rapid Tempering and Quenching Process

Application of S45C Steel Rapid Tempering and Quenching Process

s45c steel round bar

S45C steel is widely used in machinery manufacturing. S45C carbon steel is a kind of commonly used medium carbon tempered structural steel, like S45C carbon steel square bar. Normalizing can improve the cutting performance of less than 160 HBS blanks. After the steel is quenched and tempered, its comprehensive mechanical properties are superior to other medium carbon structural steel. Quenching and tempering treatment is a common heat treatment process for S45C steel. To this end, we have studied S45C steel quenching and tempering process.
The mechanical properties of the quenched and tempered parts subjected to rapid tempering were tested for hardness of 27 times on different sections of 55 mm effective thickness. The maximum hardness difference was 9 HB units and the uniformity was good.
The following items should be noted in the process specification:
Firstly, the capping temperature should be strictly controlled and no heat preservation is allowed.
Secondly, the holding time of the conventional zone is determined by the amount of the load and the effective size.
Thirdly, the loading capacity is 1/2 to 3/4 of the furnace floor, and there must be a certain gap between the work.
Fast tempering has the following advantages.
Fristly, it can meet technical requirements and it’s stable without any investment and expenses.
Secondly, each furnace can save electricity by 30.9% to 44%.
Thirdly, the fast tempering process can shorten the time by more than 20%.
Forth, the process is simple. It’s easy to be mastered and promoted.

Comments

Popular posts from this blog

30 LB RAIL FOR SALE

  30 LB RAIL FOR SALE What is a 30 lb rail? A 30 lb rail refers to a rail weighing 30 lb in meters, which is an ASCE 30 model rail produced according to ASTM A1. As a common light track, it is mainly used for laying mining track lines. Therefore, it is widely used in the South American market. The dimensions of the 30 lb rail are as follows: Head width: 42.9mm Track height: 79.4mm Track bottom width: 79.4mm Waist thickness: 8.4mm GloryRail is an important  mining rail  supplier in China. Engaged in rail supply for more than 20 years. Rail products are exported to many countries and regions around the world. Trusted and supported by many mining customers. We maintain long-term cooperative relationships with many important customers in Peru, Colombia, Panama, and Venezuela in South America BUY 30 LB RAIL FROM CHINA As the world’s most important rail tracks production base. There are six major steel mills in China producing rails with an annual output of millions of tons. G...

Study on Cooling Method of SUP9 Spring Flat Steel

Study on Cooling Method of SUP9 Spring Flat Steel Hot rolled spring flat steel bar is mainly used for the automotive industry, and it’s the raw material for automobile leaf spring  manufacturing. The main varieties of spring steel include 60Si2Mn spring steel,  SUP9 spring steel flat bar , 55SiMnVB spring steel. SUP9 spring steel flat bar is produced in accordance with the Japanese standard. At present, many leaf spring manufacturers mostly use SUP9 spring steel as the raw material for manufacturing automotive leaf springs. Compared with 60Si2Mn, SUP9 spring steel has good hardenability and low decarburization tendency, so the mechanical properties and fatigue properties of the leaf springs produced with SUP9 spring steel are better than that of 60Si2Mn steel. However, due to the good hardenability of  SUP9 steel , the hardness is often too high during actual rolling production and cooling. The reheating, quenching and tempering treatment are carried out in...

Rail clip installation

Rail clip installation rail clip installation Prerequisites for the rail clip installation 1. The rail presser is installed after the steel beam on the crane rails surface is adjusted; 2. The steel beam of the crane must be 3. The rail pressure device should be installed; 4. Before the installation of the  rail clamp , the surface paint of the crane beam is finished and meets the requirements of the current regulations; 5. Before the installation of the rail presser, the track joints should be connected, and the track joints and side bending deviations should meet the requirements of “Steel Structure Engineering and Acceptance Specifications”-83). 6. The welding of the base plate control plate and the steel suspension beam should meet the design requirements. Installation sequence and essentials A. Welding the fixed base, the fixed base can be used, the three grooves on the surface and the position of the rail presser can be positioned, and the allowable deviation of the position ...